Shutdown Tracker

Summary of Pilgrim SCRAMS 2003-2015

Summary of Pilgrim SCRAMS 2003-2015

The following is a work in progress; summary includes all SCRAM events between 2003-2015, and an incomplete list of non-SCRAM events from 2013-present. See also, this list of Pilgrim Events 1965-2013, compiled by Dave Lochbaum, Union of Concerned Scientists.

More Event Notification Reports can be found on the NRC website:

Today’s Event Reports    RSS    Archived Event Reports (1999-2015)

2015:
  • August 22: SCRAM (Automatic) – REACTOR SCRAM DUE TO A SINGLE MSIV CLOSURE; “On Saturday, August 22, 2015, at 1628 [EDT], with the reactor at 100% core thermal power (CTP) the Pilgrim Nuclear Power Station (PNPS) experienced an automatic reactor scram signal due to the rapid closure of one main steam isolation valve (MSIV).
  • Keep reading →

    Pilgrim Chronology 1967-2015

    This chronology attempts to capture the major milestones related to Pilgrim Nuclear Power Station beginning with the Town of Plymouth’s granting of a special permit to Boston Edison to construct a nuclear power facility in 1967, and ending with Entergy’s announcement on October 13, 2015 that Pilgrim will close no later than June 2019.…

    Keep reading →

    USC brief on Pilgrim’s August shutdown

    From Dave Lochbaum, Union of Concerned Scientists:

    “Attached is a brief about Saturday’s unexpected shut down at Pilgrim. The owner’s initial report did not identify the reason the Main Steam Isolation Valve closed or which of two signals automatically tripped the reactor. Because the initial report has to be made to the NRC within a short time (I think it’s an hour), it probably omitted naming the likely suspects until workers have reviewed the data and verified their suspicions.”

    UCS – MSIV Scram at Pilgrim (PDF)

    Keep reading →
    Pilgrim nuclear plant shuts down after valve malfunction

    Pilgrim nuclear plant shuts down after valve malfunction

    PLYMOUTH — The Pilgrim Nuclear Power Station’s reactor automatically shut down late Saturday, avoiding a potentially dangerous situation when a valve that regulates the steam transfer from the reactor to the turbine closed when it should have remained open.

    It marks the third time this calendar year that the plant has been forced to shut down due to mechanical failures.…

    Keep reading →
    Once again, problems plague restart of Pilgrim

    Once again, problems plague restart of Pilgrim

    PLYMOUTH — After its shutdown for reactor refueling last month, the Pilgrim Nuclear Power Station is in the process of cautiously powering back up under the watchful eyes of federal inspectors, following a failed attempt at getting the plant back on line last Friday.

    Workers had been in the process of powering up Friday morning and reached about 15 percent of capacity, when they were forced to manually force shutdown due to problems with the main condenser that uses bay water to cool steam generated by the reactor and convert it back into water.…

    Keep reading →
    Coverage of Pilgrim’s Winter Storm Shutdown

    Coverage of Pilgrim’s Winter Storm Shutdown

    Pilgrim shut down automatically at 4:05am Tuesday, January 27, 2015 after two transmission lines failed during Blizzard Juno around high tide – furthering concerns that the nuclear plant is seriously unprepared to weather the storm.